Note: Single-source report; awaiting corroboration.

The Oak Ridge Office of Environmental Management (OREM) processed 62 canisters of uranium-233 in the recent fiscal year, surpassing its goal of 50 canisters as part of cleanup efforts at Oak Ridge National Laboratory (ORNL).

Isotek, the project contractor, addressed technical challenges by developing methods such as segmenting uranium-233 canisters in the storage facility before processing. This has saved $175 million and prevented delays.

Some materials with high levels of transuranic activity require extensive downblending to meet disposal criteria. Isotek added extra sampling and technical reviews to ensure compliance with waste acceptance standards without compromising safety or operations.

To date, over 78% of the original uranium-233 inventory stored at ORNL has been processed and disposed of, with more than 700,000 pounds of solidified processed waste moved for disposal.

The project also includes extraction of the rare medical isotope thorium-229 from the uranium-233 material.