Note: Single-source report; awaiting corroboration.

The Department of Energy conducted visual surveys and groundwater radiochemical analyses of the Cactus Crater Containment Structure on Runit Island, Republic of the Marshall Islands, between 2022 and 2026. The purpose was to assess any changes in health risks for Enewetak residents from contaminants within the structure.

The study included detailed inspections of areas labeled Rings A and B, Rings C-F, and Rings G-K, including the containment dome cap. Video documentation supports findings from these inspections.

This investigation was conducted under Section 2 of Public Law 112-149, the Insular Areas Act of 2011. The report provides updated information on the condition and environmental impact of the containment structure.