The disposal cell at the Crescent Junction site has been excavated in phases and is now fully complete, reaching a depth of 25 feet below the surface.

During disposal, tailings are end-dumped from containers, loaded into dump trucks, transported to the disposal area, spread and compacted using a dozer and a sheep’s foot roller.

In October 2026, 82,864 tons of mill tailings were disposed of within the cell.

The cover system for the disposal cell consists of multiple layers of soil and rock. Interim cover is placed once the final tailings grade is met, with final cover layers installed over parts of the interim cover.